All lanes open on Fullerton Parkway Bridge at Lincoln Park Lagoon

December 7, 2012 2:24:59 PM PST
Following months of construction, all lanes on the Fullerton Parkway Bridge opened to traffic on Friday.

The bridge, which was originally built in 1940, had been reduced to one lane in each direction since March.

The trail underpass on the west side of the bridge will open later in December.


Load Comments