Dan Ryan Expressway construction work for Jane Byrne Interchange causes traffic backups downtown

Tuesday, October 6, 2020
CHICAGO (WLS) -- Overnight roadwork on the Dan Ryan Expressway has created big delays heading into downtown Chicago Tuesday morning.

The roadwork was running more than an hour-and-a-half behind schedule, with barricades not picked up until around 6:20 a.m., resulting in only a single lane of traffic starting at Roosevelt Road.

The lane closures have created long backups, with 35 to 45 minute travel times from 95th to downtown.

LIVE TRAFFIC: CHeck out conditions on our live traffic map



IDOT said it may be until 6:30 a.m. before crews are able to clear the road from the barricades from the roadwork.

The roadwork is being done as part of the Jane Byrne Interchange reconstruction project.
Copyright © 2024 WLS-TV. All Rights Reserved.