It goes over the Chicago Sanitary and Ship Canal on the city's Southwest Side.
The three-span fixed bridge was first built in 1909 and reconstructed in 1969.
It will be restored with a new concrete roadway deck, repaired girders, along with new sidewalks.
The $5 million project will be performed in two phases.
Work should be complete by November.